In order to promote public education and public safety, equal justice for all, a better informed citizenry, the rule of law, world trade and world peace, this legal document is hereby made available on a noncommercial basis, as it is the right of all humans to know and speak the laws that govern them.
EUROPEAN STANDARD
NORME EUROPÉENNE
EUROPÄISCHE NORM
EN 1991-1-6
June 2005
ICS 91.010.30
Supersedes ENV 1991-2-6:1997
Incorporating corrigendum July 2008
English version
Eurocode 1 – Actions sur les structures – Partie 1-6: Actions générales – Actions en cours d’exécution | Eurocode 1 – Einwirkungen auf Tragwerke – Teil 1-6 : Allgemeine Einwirkungen – Einwirkungen während der Ausführung |
This European Standard was approved by CEN on 13 January 2005.
CEN members are bound to comply with the CEN/CENELEC Internal Regulations which stipulate the conditions for giving this European Standard the status of a national standard without any alteration. Up-to-date lists and bibliographical references concerning such national standards may be obtained on application to the Central Secretariat or to any CEN member.
This European Standard exists in three official versions (English, French, German). A version in any other language made by translation under the responsibility of a CEN member into its own language and notified to the Central Secretariat has the same status as the official versions.
CEN members are the national standards bodies of Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden, Switzerland and United Kingdom.
Management Centre: rue de Stassart, 36 B-1050 Brussels
© 2005 CEN All rights of exploitation in any form and by any means reserved worldwide for CEN national Members.
Ref. No. EN 1991-1-6:2005: E
1Page | |||
FOREWORD | 4 | ||
BACKGROUND OF THE EUROCODE PROGRAMME | 4 | ||
STATUS AND FIELD OF APPLICATION OF EUROCODES | 5 | ||
NATIONAL STANDARDS IMPLEMENTING EUROCODES | 5 | ||
LINKS BETWEEN EUROCODES AND HARMONIZED TECHNICAL SPECIFICATIONS (ENS AND ETAS) FOR PRODUCTS | 6 | ||
ADDITIONAL INFORMATION SPECIFIC TO EN 1991-1-6 | 6 | ||
NATIONAL ANNEX | 7 | ||
SECTION 1 GENERAL | 8 | ||
1.1 | SCOPE | 8 | |
1.2 | NORMATIVE REFERENCES | 8 | |
1.3 | ASSUMPTIONS | 9 | |
1.4 | DISTINCTION BETWEEN PRINCIPLES AND APPLICATION RULES | 9 | |
1.5 | TERMS AND DEFINITIONS | 9 | |
1.6 | SYMBOLS | 10 | |
SECTION 2 CLASSIFICATION OF ACTIONS | 12 | ||
SECTION 3 DESIGN SITUATIONS AND LIMIT STATES | 14 | ||
3.1 | GENERAL – IDENTIFICATION OF DESIGN SITUATIONS | 14 | |
3.2 | ULTIMATE LIMIT STATES | 15 | |
3.3 | SERVICEABILITY LIMIT STATES | 16 | |
SECTION 4 REPRESENTATION OF ACTIONS | 17 | ||
4.1 | GENERAL | 17 | |
4.2 | ACTIONS ON STRUCTURAL AND NON-STRUCTURAL MEMBERS DURING HANDLING | 17 | |
4.3 | GEOTECHNICAL ACTIONS | 18 | |
4.4 | ACTIONS DUE TO PRESTRESSING | 18 | |
4.5 | PRE-DEFORMATIONS | 18 | |
4.6 | TEMPERATURE, SHRINKAGE, HYDRATION EFFECTS | 18 | |
4.7 | WIND ACTIONS | 19 | |
4.8 | SNOW LOADS | 19 | |
4.9 | ACTIONS CAUSED BY WATER | 19 | |
4.10 | ACTIONS DUE TO ATMOSPHERIC ICING | 21 | |
4.11 | CONSTRUCTION LOADS | 21 | |
4.12 | ACCIDENTAL ACTIONS | 24 | |
4.13 | SEISMIC ACTIONS | 24 | |
ANNEX A1 | 25 | ||
(NORMATIVE) | 25 | ||
SUPPLEMENTARY RULES FOR BUILDINGS | 25 | ||
A1.1 | ULTIMATE LIMIT STATES | 25 | |
A1.2 | SERVICEABILITY LIMIT STATES | 25 | |
A1.3 | HORIZONTAL ACTIONS | 25 | |
ANNEX A2 | 26 | ||
(NORMATIVE) | 26 | ||
SUPPLEMENTARY RULES FOR BRIDGES | 26 | ||
A2.1 | ULTIMATE LIMIT STATES | 26 | |
A2.2 | SERVICEABILITY LIMIT STATES | 26 | |
A2.3 | DESIGN VALUES OF DEFLECTIONS | 26 | |
A2.4 | SNOW LOADS | 26 | |
A2.5 | CONSTRUCTION LOADS | 27 | |
ANNEX B (INFORMATIVE) ACTIONS ON STRUCTURES DURING ALTERATION, RECONSTRUCTION OR DEMOLITION | 28 2 | ||
BIBLIOGRAPHY | 28 |
This European document (EN 1991-1-6), has been prepared by Technical Committee CEN/TC250 “Structural Eurocodes”, the Secretariat of which is held by BSI.
This European Standard shall be given the status of national standard, either by publication of an identical text or by endorsement, at the latest by December 2005, and conflicting national standards shall be withdrawn at the latest by March 2010.
CEN/TC250 is responsible for all Structural Eurocodes.
This document will supersede ENV 1991-2-6:1996.
Annexes A1 and A2 are normative and Annex B is informative. This standard includes a Bibliography.
According to the CEN/CENELEC Internal Regulations, the national standards organizations of the following countries are bound to implement this European Standard: Austria, Belgium, Cyprus, Czech Republic, Denmark, Estonia, Finland, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania, Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Slovakia, Slovenia, Spain, Sweden, Switzerland and the United Kingdom.
In 1975, the Commission of the European Community decided on an action programme in the field of construction, based on Article 95 of the Treaty. The objective of the programme was the elimination of technical obstacles to trade and the harmonisation of technical specifications.
Within this action programme, the Commission took the initiative to establish a set of harmonized technical rules for the design of construction works which, in a first stage, would serve as an alternative to the national rules in force in the Member States and, ultimately, would replace them.
For fifteen years, the Commission, with the help of a Steering Committee with Representatives of Member States, conducted the development of the Eurocodes programme, which led to the first generation of European codes in the 1980s.
In 1989, the Commission and the Member States of the EU and EFTA decided, on the basis of an agreement1 between the Commission and CEN, to transfer the preparation and the publication of the Eurocodes to CEN through a series of Mandates, in order to provide them with a future status of European Standard (EN). This links de facto the Eurocodes with the provisions of all the Council’s Directives and/or Commission’s Decisions dealing with European standards (e.g. the Council Directive 89/106/EEC on construction products – CPD – and Council Directives 93/37/EEC, 92/50/EEC and 89/440/EEC on public works and services and equivalent EFTA Directives initiated in pursuit of setting up the internal market).
The Structural Eurocode programme comprises the following standards generally consisting of a number of parts:
EN 1990 | Eurocode | Basis of structural design |
EN 1991 | Eurocode 1: | Actions on structures |
EN 1992 | Eurocode 2: | Design of concrete structures |
EN 1993 | Eurocode 3: | Design of steel structures |
EN 1994 | Eurocode 4: | Design of composite steel and concrete structures |
EN 1995 | Eurocode 5: | Design of timber structures |
EN 1996 | Eurocode 6: | Design of masonry structures |
EN 1997 | Eurocode 7: | Geotechnical design 4 |
EN 1998 | Eurocode 8: | Design of structures for earthquake resistance |
EN 1999 | Eurocode 9: | Design of aluminium structures |
1 Agreement between the Commission of the European Communities and the European Committee for Standardisation (CEN) concerning the work on EUROCODES for the design of building and civil engineering works (BC/CEN/03/89).
Eurocode standards recognize the responsibility of regulatory authorities in each Member State and have safeguarded their right to determine values related to regulatory safety matters at the national level where these continue to vary from State to State.
The Member States of the EU and EFTA recognize that Eurocodes serve as reference documents for the following purposes :
The Eurocodes, as far as they concern the construction works themselves, have a direct relationship with the Interpretative Documents2 referred to in Article 12 of the CPD, although they are of a different nature from harmonized product standards3. Therefore, technical aspects arising from the Eurocodes work need to be adequately considered by CEN Technical Committees and/or EOTA Working Groups working on product standards with a view to achieving a full compatibility of these technical specifications with the Eurocodes.
The Eurocode standards provide common structural design rules for everyday use for the design of whole structures and component products of both a traditional and an innovative nature. Unusual forms of construction or design conditions are not specifically covered and additional expert consideration will be required by the designer in such cases.
The National Standards implementing Eurocodes will comprise the full text of the Eurocode (including any annexes), as published by CEN, which may be preceded by a National title page and National foreword, and may be followed by a National Annex.
The National Annex may only contain information on those parameters which are left open in the Eurocode for national choice, known as Nationally Determined Parameters, to be used for the design of buildings and civil engineering works to be constructed in the country concerned, i.e. :
It may also contain:
2 According to Article 3.3 of the CPD, the essential requirements (ERs) shall be given concrete form in interpretative documents for the creation of the necessary links between the essential requirements and the mandates for hENs and ETAGs/ETAs.
3 According to Article 12 of the CPD the interpretative documents shall :
There is a need for consistency between the harmonized technical specifications for construction products and the technical rules for works4. Furthermore, all the information accompanying the CE Marking of the construction products which refer to Eurocodes shall clearly mention which Nationally Determined Parameters have been taken into account.
EN 1991-1-6 describes Principles and Application rules for the determination of actions to be considered during execution of buildings and civil engineering works, including the following aspects :
EN 1991 -1 -6 is intended for use by:
EN 1991-1-6 is intended to be used with EN 1990, the other parts of EN 1991 and EN 1992 to EN 1999 for the design of structures.
4 see Article 3.3 and Article 12 of the CPD, as well as clauses 4.2, 4.3.1, 4.3.2 and 5.2 of ID 1.
6This part of EN1991 gives alternative procedures, values and recommendations for classes with notes indicating where national choices may have to be made. Therefore the National Standard implementing EN 1991-1-6 should have a National Annex containing all Nationally Determined Parameters to be used for the design of buildings and civil engineering works to be constructed in the relevant country.
National choice is allowed in EN 1991-1-6 through clauses:
Clause | Item |
---|---|
1.1(3) | Design rules for auxiliary construction works |
2.2 (4) NOTE 1 |
Positioning of construction loads classified as free |
3.1(1)P | Design situation corresponding to storm conditions |
3.1(5) NOTE 1 | Return periods for the determination of the characteristic values of variable actions during execution |
NOTE 2 | Minimum wind speed during execution |
3.1(7) | Rules for the combination of snow loads and wind actions with construction loads |
3.1(8) NOTE 1 | Rules concerning imperfections in the geometry of the structure |
3.3(2) | Criteria associated with serviceability limit states during execution |
3.3(6) | Serviceability requirements for auxiliary construction works |
4.9(6) NOTE 2 | Loads and water levels for floating ice |
4.10(1)P | Definition of actions due to atmospheric icing |
4.11.1 (1) |
Recommended characteristic values of construction loads Qca and Qcb |
4.11.2(1) NOTE 2 |
Construction loads during casting of concrete |
4.12(1)P NOTE 2 | Dynamic effects due to accidental actions |
4.12(2) | Dynamic effects due to falls of equipment |
4.12 (3) | Design values of human impact loads |
4.13(2) | Seismic actions |
Annex A1 A1.1(1) | Representative values of the variable actions due to construction loads |
Annex A1 A1.3(2) | Characteristic values of equivalent horizontal forces |
Annex A2 A2.3(1) NOTE 1 |
Design values of vertical deflections for the incremental launching of bridges |
Annex A2 A2.4(2) | Reduction of the characteristic value of snow loads |
Annex A2 A2.4(3) | Reduced values of characteristic snow loads for the verification of static equilibrium |
Annex A2 A2.5(2) | Design values of horizontal friction forces |
Annex A2 A2.5(3) | Determination of friction coefficients μmin and μmax |
NOTE 1 This part of EN 1991 may be used as guidance for the determination of actions to be taken into account for different types of construction works, including structural alterations such as refurbishment and/or partial or full demolition. Further rules and guidance is given in Annexes A1, A2 and B.
NOTE 2 Rules concerning the safety of people in and around the construction site due to matters outside the scope of this European Standard may be defined for the individual project.
Section 1 : General
Section 2 : Classification of actions
Section 3: Design situations and limit states
Section 4 : Representation of actions
Annex A1 : Supplementary rules for buildings (normative)
Annex A2 : Supplementary rules for bridges (normative)
Annex B : Actions on structures during alteration, reconstruction or demolition (informative)
NOTE Design rules for auxiliary construction works may be defined in the National Annex or for the individual project. Guidance may be found in the relevant European standards. For example, design rules for formworks and falseworks are given in EN 12812.
This European standard incorporates by dated or undated reference provisions from other publications. These normative references are cited at the appropriate places in the text and the publications are listed hereafter. For dated references, subsequent amendments to, or revisions of, any of these publications apply to this European standard only when incorporated in it by amendment or revision. For undated references, the latest edition of the publications referred to applies (including amendments).
NOTE The Eurocodes were published as European Prestandards. The following European Standards which are published or in preparation are cited in normative clauses or in NOTES to normative clauses.
EN 1990 | Eurocode : Basis of structural design |
EN 1991-1-1 | Eurocode 1 : Actions on structures Part 1-1: Densities, self-weight, imposed loads for buildings |
EN 1991-1-2 | Eurocode 1 : Actions on structures Part 1-2: Fire actions |
EN 1991-1-3 | Eurocode 1 : Actions on structures Part 1-3: General actions: Snow loads |
EN 1991-1-4 | Eurocode 1 : Actions on structures Part 1-4: General actions: Wind actions |
EN 1991-1-5 | Eurocode 1 : Actions on structures Part 1-5: General actions: Thermal actions |
EN 1991-1-7 | Eurocode 1 : Actions on structures Part 1 -7: Accidental actions |
EN 1991-2 | Eurocode 1 : Actions on structures Part 2: Traffic loads on bridges 8 |
EN 1991-3 | Eurocode 1: Actions on structures Part 3: Actions induced by cranes and machinery |
EN 1991-4 | Eurocode 1: Actions on structures Part 4: Silos and tanks |
EN 1992 | Eurocode 2: Design of concrete structures |
EN 1993 | Eurocode 3: Design of steel structures |
EN 1994 | Eurocode 4: Design of composite steel and concrete structures |
EN 1995 | Eurocode 5: Design of timber structures |
EN 1996 | Eurocode 6: Design of masonry structures |
EN 1997 | Eurocode 7: Geotechnical design |
EN 1998 | Eurocode 8: Design of structures for earthquake resistance |
EN 1999 | Eurocode 9: Design of aluminium structures |
any works associated with the construction processes that are not required after use when the related execution activities are completed and they can be removed (e.g. falsework, scaffolding, propping systems, cofferdam, bracing, launching nose)
NOTE Completed structures for temporary use (e.g. a bridge for temporarily diverted traffic) are not regarded as auxiliary construction works.
load that can be present due to execution activities, but is not present when the execution activities are completed.
is the scour depth due to river flow, independently of the presence of an obstacle (scour depth depends on the flood magnitude)
is the scour depth due to water vortices next to an obstacle such as a bridge pier.
9For the purpose of this European standard, the following symbols apply (see also EN 1990).
Latin upper case letters
Adeb | area of obstruction (accumulation of debris) |
Fdeb | horizontal forces exerted by accumulation of debris |
Fcb.k | characteristic values of concentrated construction loads Qcb |
Fhn | nominal horizontal forces |
Fwa | horizontal forces due to currents on immersed obstacles |
Qc | Construction loads (general symbol) |
Qca | construction loads due to working personnel, staff and visitors, possibly with hand tools or other small site equipment |
Qcb | construction loads due to storage of moveable items (e.g. building and construction materials, precast elements, and equipment) |
Qcc | construction loads due to non permanent equipment in position for use during execution, either static (e.g. formwork panels, scaffolding, falsework, machinery, containers) or during movement (e.g. travelling forms, launching girders and nose, counterweights) |
Qcd | construction loads due to moveable heavy machinery and equipment, usually wheeled or tracked (e.g. cranes, lifts, vehicles, lifttrucks, power installations, jacks, heavy control devices) |
Qce | construction loads from accumulation of waste materials (e.g. surplus construction materials, excavated soil or demolition materials) |
Qcf | construction loads from parts of a structure in temporary states (under execution) before the final design actions take effect |
Qw | wind actions |
Qwa | actions caused by water |
Latin lower case letters
b | width of an immersed object |
cpe | external wind pressure coefficients for free-standing walls |
h | water depth |
k | shape factor for an immersed object |
kdeb | debris density parameter 10 |
p | flowing water pressure, which may be current water |
qca,k | characteristic values of the uniformly distributed loads of construction loads Qca |
qcb,k | characteristic values of the uniformly distributed loads of construction loads Qcb |
qcc,k | characteristic values of the uniformly distributed loads representing construction loads Qcc |
vwa | is the mean speed of the water averaged over the depth, in m/s; |
Greek lower case letters
Pwa | density of water |
NOTE Table 2.1 gives the classifications of actions (other than construction loads).
Related clause in this standard | Action | Classification | Remarks | Source | |||
---|---|---|---|---|---|---|---|
Variation in time | Classification / Origin | Spatial variation | Nature (static/dynamic) | ||||
4.2 | Self weight | Permanent | Direct | Fixed with tolerance / free | Static | Free during transportation / storage. Dynamic if dropped. | EN 1991-1-1 |
4.3 | Soil movement | Permanent | Indirect | Free | Static | EN 1997 | |
4.3 | Earth pressure | Permanent / variable | Direct | Free | Static | EN 1997 | |
4.4 | Prestressing | Permanent / variable | Direct | Fixed | Static | Variable for local design (anchorage). | EN 1990, EN 1992 to EN 1999 |
4.5 | Pre-deformations | Permanent / variable | Indirect | Free | Static | EN 1990 | |
4.6 | Temperature | Variable | Indirect | Free | Static | EN 1991-1.5 | |
4.6 | Shrink-age/hydration effects | Permanent / variable | Indirect | Free | Static | EN 1992, EN 1993, EN1994 | |
4.7 | Wind actions | Variable / accidental | Direct | Fixed/free | Static / dynamic | (*) | EN 1991-1-4 |
4.8 | Snow loads | Variable/accidental | Direct | Fixed/free | Static / dynamic | (*) | EN 1991-1-3 |
4.9 | Actions due to water | Permanent / variable/accidental | Direct | Fixed/free | Static / dynamic | Permanent / variable according to project specifications. Dynamic for water currents if relevant | EN 1990 |
4.10 | Atmospheric ice loads | Variable | Direct | Free | Static / dynamic | (*) | ISO 12494 |
4.12 | Accidental | Accidental | Direct/indirect | Free | Static/dynamic | (*) | EN 1990, EN 1991-1-7 |
4.13 | Seismic | Variable / accidental | Direct | Free | Dynamic | (*) | EN 1990 (4.1), EN1998 |
(*): The source documents need to be examined with the National Annexes in which additional relevant information may be provided. |
NOTE 1 Table 2.2 gives the classification of construction loads
Related clause in this standard | Action (short description) | Classification | Remarks | Source | |||
---|---|---|---|---|---|---|---|
Variation in time | Classification / Origin | Spatial variation | Nature (static/dynamic) | ||||
4.11 | Personnel and hand tools | Variable | Direct | Free | Static | ||
4.11 | Storage movable items | Variable | Direct | Free | Static / dynamic | Dynamic in case of dropped loads | EN 1991-1-1 |
4.11 | Non-permanent equipment | Variable | Direct | Fixed / free | Static / dynamic | EN 1991-3 | |
4.11 | Movable heavy machinery and equipment | Variable | Direct | Free | Static / dynamic | EN 1991-2, EN 1991-3 | |
4.11 | Accumulation of waste materials | Variable | Direct | Free | Static / dynamic | Can impose loads on e.g. vertical surfaces also | EN 1991-1-1 |
4.11 | Loads from parts of structure in temporary states | Variable | Direct | Free | Static | Dynamic effects are excluded | EN 1991-1-1 |
NOTE 2 Table 4.1 gives the full description and classification of construction loads
NOTE 3 Construction loads, which are caused by cranes, equipment, auxiliary construction works/structures may be classified as fixed or free actions depending on the possible position(s) for use.
NOTE The deviations may be defined for the individual project.
NOTE 1 The limits may be defined in the National Annex and for the individual project.
NOTE 2 In accordance with EN 1990:2002, 1.3(2), control measures may have to be adopted to verify the conformity of the position and moving of construction loads with the design assumptions.
NOTE For wind actions during storm conditions (e.g. cyclone, hurricane) the National Annex may select the design situation to be used. The recommended design situation is the accidental design situation.
NOTE 1 The return periods for the determination of characteristic values of variable actions during execution may be defined in the National Annex or for the individual project. Recommended return periods for climatic actions are given in table 3.1, depending on the nominal duration of the relevant design situation.
Duration | Return period (years) |
---|---|
≤ 3 days | 2a |
≤ 3 months (but > 3 days) | 5b |
≤ 1 year (but > 3 months) | 10 |
> 1 year | 50 |
|
14NOTE 2 A minimum wind velocity during execution may be defined in the National Annex or for the individual project. The recommended basic value for durations of up to 3 months is 20 m/s in accordance with EN 1991-1-4.
NOTE 3 Relationships between characteristic values and return period for climatic actions are given in the appropriate parts of EN 1991.
NOTE These rules may be defined in the National Annex or for the individual project.
NOTE 1 These imperfections may be defined in the National Annex or for the individual project. See also Annex A2 and EN 1990:2002, 3.5 (3) and (7).
NOTE 2 For concrete structures, see also the appropriate CEN standards, including those on “Precast Concrete Products”, developed by CEN/TC229
NOTE See EN 1991-1-4 and EN 1991-2.
NOTE Significant accelerations may be excluded where possible movements are strictly controlled by appropriate devices.
NOTE These actions may commonly be determined in the same manner as specified in (5) above.
NOTE For long construction phases, scour levels may have to be taken into account for the design of execution stages for permanent or auxiliary construction works immersed in flowing water, which may include currents. These levels may be defined for the individual project, see 4.9(4).
NOTE 1 The combinations of actions for accidental design situations can either include the accidental action explicitly or refer to a situation after an accidental event. See EN 1990:2002, Section 6.
NOTE 2 Generally, accidental design situations refer to exceptional conditions applicable to the structure or its exposure, such as impact, local failure and subsequent progressive collapse, fall of structural or non-structural parts, and, in the case of buildings, abnormal concentrations of building equipment and/or building materials, water accumulation on steel roofs, fire, etc.
NOTE 3 See also EN 1991-1-7.
15NOTE The criteria associated with the serviceability limit states may be defined in the National Annex or for the individual project. See EN 1992 to EN 1999.
NOTE Where frequent values of particular actions need to be considered, these values may be defined for the individual project.
NOTE These requirements may be defined in the National Annex or for the individual project.
NOTE 1 The representative values of actions during execution may be different from those used in the design of the completed structure. Common actions during execution, specific construction loads and methods for establishing their values are given in this Section.
NOTE 2 See also Section 2 for classification of actions and Section 3 for nominal duration of transient design situations.
NOTE 3 The action effects may be minimized or eliminated by appropriate detailing, providing auxiliary construction works or by protecting/safety devices.
NOTE 1 Depending on the construction procedures, the supporting parts of the structure may be subjected to loads greater than the imposed loads for which they are designed for the persistent design situation. Additionally, the supporting slabs may not have developed their full strength capacities.
NOTE 2 See also 4.11 Construction loads.
NOTE Lower and upper bounds of friction coefficients may have to be taken into account. Friction coefficients may be defined for the individual project.
NOTE See EN 1991-3 for the determination of vertical and horizontal accelerations due to transport and hoisting.
NOTE Movements of auxiliary construction works may cause displacements and additional stresses.
NOTE It may be possible to adjust the calculated imposed deformations by considering the full soil-structure interaction.
NOTE Prestressing forces during execution may be determined according to the requirements of EN 1992 to EN 1999 and possible specific requirements defined for the individual project.
NOTE See also Section 3.
NOTE Pre-deformations can result from, for example, displacements of supports (such as loosening of ropes or cables, including hangers, and displacements of bearings).
NOTE 1 For buildings, the actions due to temperature and shrinkage are not generally significant if appropriate detailing has been provided for the persistent design situation.
NOTE 2 Restraints from the effects of friction of bearings may have to be taken into account (see also 4.1 (5)).
NOTE 1 Temperature can rise significantly in a massive concrete structure after casting, with consequent thermal effects.
NOTE 2 The extreme values of the minimum and maximum temperatures to be taken into account in the design may change-due to seasonal variations.
NOTE See EN 1337.
NOTE Criteria and procedures may be defined for the individual project.
NOTE See 3.1 for recommended return periods.
NOTE The maximum wind speed may be defined for the individual project. See also 3.1(6).
NOTE In such cases, the external pressure coefficients cpe may have to be applied (e.g. for free-standing walls).
NOTE 1 For bridges see also Annex A2.
NOTE 2 See 3.1 for recommended return periods.
NOTE In general, phenomena covered by hydrodynamic effects are:
NOTE The classification of actions caused by water as permanent or variable may be defined for the individual project, taking account of the specific environmental conditions.
where:
Vwa is the mean speed of the water averaged over the depth, in m/s; pwa is the density of water, in kg/m3; h is the water depth, but not including local scour depth, in m; b is the width of the object, in m; k is the shape factor, where k = 1,44 for an object of square or rectangular horizontal cross-section, and k = 0,70 for an object of circular horizontal cross-section.
Figure 4.1: Pressure and force due to currents
20NOTE 1 Fwa may be used to check the stability of bridge piers and cofferdams, etc. A more refined formulation may be used to determine Fwa for the individual project.
NOTE 2 The effect of scour may be taken into account for the design where relevant. See 3.1(12) and 1.5.2.3 and 1.5.2.4.
Fdeb = kdeb Adeb v2wa (4.2)
where:
kdeb is a debris density parameter, in kg/m3 Vwa is the mean speed of the water averaged over the depth, in m/s; Adeb is the area of obstruction presented by the trapped debris and falsework, in m2
NOTE 1 Expression (4.2) may be adjusted for the individual project, taking account of its specific environmental conditions.
NOTE 2 The recommended value of kdeb is 666 kg/m3
NOTE 1 The actions may be considered as a distributed load and acting in the direction of current flow equal to the highest or lower water levels, whichever gives the most unfavourable effects.
NOTE 2 The loads and water levels may be defined in the National Annex or for the individual project.
NOTE The representative values of these actions may be defined in the National Annex or for the individual project. Guidance may be found in EN 1993-3 and in ISO 12494.
NOTE 1 See EN 1990 and EN 1991 for advice on the simultaneity of non construction and construction loads.
NOTE 2 Groupings of loads to be taken into account are dependent on the individual project.
NOTE 3 See also Table 2.2.
Construction Loads (Qc) | ||||
---|---|---|---|---|
Actions | Representation | Notes and remarks | ||
Type | Symbol | Description | ||
Personnel, and hand tools | Qca | Working personnel, staff and visitors, possibly with hand tools or other small site equipment | Modelled as a uniformly distributed load qca and applied to obtain the most unfavourable effects. | NOTE 1: The characteristic value qca,k of the uniformly distributed load may be defined in the National Annex or for the individual project.
NOTE 2: The recommended value is 1,0 kN/m2. See also 4.11.2. |
Storage of movable items | Qcb | Storage of moveable items, e.g.:
– building and construction materials, precast elements, and – equipment |
Modelled as free actions and should be represented as appropriate by:
– a uniformly distributed load qcb; – a concentrated load Fcb. |
NOTE 3: The characteristic values of the uniformly distributed load and the concentrated load may be defined in the National Annex or for the individual project. For bridges, the following values are recommended minimum values:
– qcb,k = 0,2 kN/m2; – Fcb,k = 100 kN where Fcb,k may be applied over a nominal area for detailed design. For densities of construction materials, see EN1991-1-1. |
Non-permanent equipment | Qcc | Non-permanent equipment in position for use during execution, either:
– static (e.g. formwork panels, scaffolding, falsework, machinery, containers) or – during movement (e.g. travelling forms, launching girders and nose, counterweights) |
Modelled as free actions and should be represented as appropriate by:
– a uniformly distributed load qcc; |
NOTE 4: These loads may be defined for the individual project using information given by the supplier. Unless more accurate information is available, the loads may be modelled by a uniformly distributed load with a recommended minimum characteristic value of qcc,k = 0,5 kN/m2.
A range of CEN design codes are available, for example, see EN 12811 and for formwork and falsework design see EN 12812. |
Moveable heavy machinery and equipment | Qcd | Moveable heavy machinery and equipment, usually wheeled or tracked, (e.g. cranes, lifts, vehicles, lift trucks, power installations, jacks, heavy lifting devices) | Unless specified should be modelled on information given in the relevant parts of EN 1991. | Information for the determination of actions due to vehicles when not defined in the project specification, may be found in EN 1991-2.
Information for the determination of actions due to cranes is given in EN 1991-3. |
Accumulation of waste materials | Qce | Accumulation of waste materials (e.g. surplus construction materials, excavated soil, or demolition materials) | Taken into account by considering possible mass effects on horizontal, inclined and vertical elements (such as walls). | NOTE 5: These loads may vary significantly, and over short time periods, depending on types of materials, climatic conditions, build-up rates and clearance rates, for example. |
Loads from parts of a structure in a temporary state | Qcf | Loads from parts of a structure in a temporary state (under execution) before the final design actions take effect (e.g. loads from lifting operations) | Taken into account and modelled according to the planned execution sequences, including the consequences of those sequences (e.g. loads and reverse load effects due to particular processes of construction, such as assemblage) | See also 4.11.2 for additional loads due to fresh concrete |
NOTE 1 Recommended values of ψ factors for construction loads are given in Annex A1 of this standard for buildings, and in Annex A2 to EN 1990 for bridges.
NOTE 2 Other types of construction loads may need to be taken into account. These loads may be defined for the individual project.
NOTE See also 3.1 (10) and EN 1990, Annexes A1 and A2.
NOTE 1 For the density of fresh concrete see EN 1991-1-1:2002 Table A.1.
NOTE 2 Qca, Qcc and Qcf may be given in the National Annex
NOTE 3 Recommended values of actions due to construction loads during casting of concrete (Qcf) may be taken from Table 4.2, and for fresh concrete from EN 1991 -1 -1 ;2002, Table A. 1. Other values may have to be defined, for example, when using self-levelling concrete or precast products.
NOTE 4 Loads according to (1), (2) and (3), as given in Table 4.2, are intended to be positioned to cause the maximum effects, which may be symmetrical or not.
Action | Loaded area | Load in kN/m2 |
---|---|---|
(1) | Outside the working area | 0,75 covering Qca |
(2) | Inside the working area 3 m × 3 m (or the span length if less) | 10 % of the self-weight of the concrete but not less than 0,75 and not more than 1,5
Includes Qca and Qcf |
(3) | Actual area | Self-weight of the formwork, load-bearing element (Qcc) and the weight of the fresh concrete for the design thickness (Qcf) |
NOTE See also A1.3(2).
NOTE 1 Abnormal concentrations of building equipment and/or building materials on load-bearing structural members are not regarded as accidental actions.
NOTE 2 Dynamic effects may be defined in the National Annex or for the individual project. The recommended value of the dynamic amplification factor is 2. In specific cases a dynamic analysis is needed.
NOTE 3 Accidental actions from cranes may be defined for the individual project. See also EN 1991-3.
NOTE The dynamic effects due to such falls of equipment may be given in the National Annex or for the individual project.
NOTE The design value of the human impact force may be defined in the National Annex or for the individual project. Examples of values are :
NOTE: See also EN1991-1-7.
NOTE The design values of ground acceleration and the importance factor γ1 may be defined in the National Annex or for the individual project.
(normative)
NOTE 1 For values of γf and ψ factors see EN 1990, Annex A1.
NOTE 2 Representative values of the variable action due to construction loads may be set by the National Annex, within a recommended range of ψ0 =0,6 to 1,0. The recommended value of ψ0 is 1,0. The minimum recommended value of ψ2 is 0,2 and it is further recommended that values below 0,2 are not selected.
NOTE 3 ψ1 does not apply to construction loads during execution.
NOTE For recommended values of ψ factors see A1.1, Notes 1 and 2.
NOTE: See also 4.7 and EN 1990:2002, 3.5(7).
NOTE The characteristic values of these equivalent horizontal forces may be defined in the National Annex or for the individual project. The recommended value is 3 % of the vertical loads from the most unfavourable combination of actions.
(normative)
NOTE For values of γf and ψ factors see EN 1990, Annex A2.
Figure A2.1 : Deflections of bearings during execution for bridges built by the incremental launching method
NOTE 1 The design values of vertical deflection may be defined in the National Annex or for the individual project. The recommended values are:
- – ± 10 mm longitudinally for one bearing, the other bearings being assumed to be at the theoretical level (Figure A2.1a);
- – ± 2,5 mm in the transverse direction for one bearing, the other bearings being assumed to be at the theoretical level (Figure A2.1b).
NOTE 2 The deflections in the longitudinal and transverse directions are considered separately.
NOTE The reduction may be defined in the National Annex or for the individual project. The recommended characteristic value is 30 % of the characteristic value for permanent design situations.
NOTE The conditions of application of this rule and the reduced percentage value (x %) may be defined in the National Annex. The recommended value for x is 75%.
NOTE The value of x% may be specified in the National Annex. The recommended value is 10 %.
NOTE 1 The friction coefficients, μmin and μmax, may be defined in the National Annex or for the individual project.
NOTE 2 Unless more accurate values are available from tests for movements on very low friction surfaces (e.g. PTFE -polytetrafluoroethylene) the recommended values are :
(informative)
EN 1337 | Structural bearings |
EN 12811 | Temporary works equipment |
EN 12812 | Falsework. Performance requirements and general design |
ISO 12494 | Atmospheric Icing of Structures |